| Client: | Farnham Estate |
| Main Contractor & PSCS: | Bennet Construction |
| Location: | Cavan Town, Co. Cavan |
This spectacular 4-star, 158-bedroom hotel, spa and health centre, conference centre, and golf course is nestled on 1,300 acres of land.
Situated on the outskirts of Cavan Town, the Farnham team required expertise, experience, and professionalism only Cleantech Civils can provide.
Key Features of our Scope of Works
- Extensive site clearance, installation of special supportive mattresses system for the main car park, tarmac & white lining, tree felling, drainage systems, under-pinning of existing buildings, bridge rehabilitation and conservation, footpaths and landscaping.
- Sewerage works consisted of constructing a gravity sewer main and a new sewer pumping station for the hotel.
- Storm water disposal works included the installation of petrol interceptors, flow control units, SUD’s ponds and hydro-break units.
- Construction of car parks and associated works including:
- the erection of over 60 lighting columns;
- 40 uplighters;
- in excess of 10,000m of ducting and cables were installed to allow for the public lighting and security systems.
- Road construction consisted of over 4km of new 6m wide roadway to provide access to the hotel and grounds which included all associated works and drainage.
Key Features of our Scope of Works
- Extensive site clearance, installation of special supportive mattresses system for the main car park, tarmac & white lining, tree felling, drainage systems, under-pinning of existing buildings, bridge rehabilitation and conservation, footpaths and landscaping.
- Sewerage works consisted of constructing a gravity sewer main and a new sewer pumping station for the hotel.
- Storm water disposal works included the installation of petrol interceptors, flow control units, SUD’s ponds and hydro-break units.
- Construction of car parks and associated works including:
- the erection of over 60 lighting columns;
- 40 uplighters;
- in excess of 10,000m of ducting and cables were installed to allow for the public lighting and security systems.
- Road construction consisted of over 4km of new 6m wide roadway to provide access to the hotel and grounds which included all associated works and drainage.
How Cleantech Civils Added Value
We were proud to be involved in every aspect of this exciting Irish construction project from start to finish, which kicked off with the introduction of value engineering proposals for discussion. Through collaboration and commitment, the project was a great success. The client was particularly pleased with the main car park, constructed upon soft peat and supported by layers of geogrids and terrams. Through this particular civil engineering plan, we avoided the need to extract soft material and replace it with suitable fill.
One of the biggest challenges our team faced here was the need to work on multiple project elements simultaneously. However, multitasking without compromising quality is our team’s forte. From groundworks to primary construction, sewers and watermains, we left no stone unturned in constructing a flawless infrastructure in every way. We also included a reservoir and pump station, with M&E and rising mains for all sewerage and potable water to connect the site’s infrastructure along 4km of public roads.
How Cleantech Civils Added Value
We were proud to be involved in every aspect of this exciting Irish construction project from start to finish, which kicked off with the introduction of value engineering proposals for discussion. Through collaboration and commitment, the project was a great success. The client was particularly pleased with the main car park, constructed upon soft peat and supported by layers of geogrids and terrams. Through this particular civil engineering plan, we avoided the need to extract soft material and replace it with suitable fill.
One of the biggest challenges our team faced here was the need to work on multiple project elements simultaneously. However, multitasking without compromising quality is our team’s forte. From groundworks to primary construction, sewers and watermains, we left no stone unturned in constructing a flawless infrastructure in every way. We also included a reservoir and pump station, with M&E and rising mains for all sewerage and potable water to connect the site’s infrastructure along 4km of public roads.