| Client: | ESB Networks |
| Main Contractor & PSCS : | Cleantech Civils |
| Location: | Killala, Co. Mayo |
Cleantech Civils were responsible for constructing an Air Insulated Switchgear (AIS) this 110kv Tawnaghmore Substation. Located at a site adjoining the Killala Business Park, County Mayo.
Key Features of our Scope of Works
- Clearance and levelling of the site, and the construction of an access road.
- Construction of substation, compound and foundations for 2 No. new transmission tower masts.
- Associated HDPE pipe power cable ducts for electrical cable circuits from the station.
- Block cable ducts and HDPE pipe ducts for control cables routes to the new control building.
- Installation of earth grid to 110kV compound.
- New storm water drainage system with soak away and in-bund oil interceptors.
- New foul drainage system which includes a treatment unit and percolation area.
- Installation of new watermain to the 110kV compound.
- Construction of 2 new entrances and gates from internal ESB Power Generation roads into new GIS station compound.
- Installation of new palisade fence and compound gates.
Key Features of our Scope of Works
- Clearance and levelling of the site, and the construction of an access road.
- Construction of substation, compound and foundations for 2 No. new transmission tower masts.
- Associated HDPE pipe power cable ducts for electrical cable circuits from the station.
- Block cable ducts and HDPE pipe ducts for control cables routes to the new control building.
- Installation of earth grid to 110kV compound.
- New storm water drainage system with soak away and in-bund oil interceptors.
- New foul drainage system which includes a treatment unit and percolation area.
- Installation of new watermain to the 110kV compound.
- Construction of 2 new entrances and gates from internal ESB Power Generation roads into new GIS station compound.
- Installation of new palisade fence and compound gates.
How Cleantech Civils Added Value
The main gravity sewer pipe to the pump station was constructed across very poor ground conditions. The solution required a floating type design for the pipes and included one river crossing requiring fluming and over pumping. The storage and pump tank required breaking out large volumes of limestone rock in a flooded area with proximity to the local river. The Cleantech Civils team mitigated and managed all environmental risks.
Our team’s expertise guaranteed the successful delivery of this project. We managed our works in a busy site location – with simultaneous construction being at the nearby Killala Business Park. The project was successfully delivered on time, within the budget, and with a strong focus on collaboration with the ESB.
How Cleantech Civils Added Value
The main gravity sewer pipe to the pump station was constructed across very poor ground conditions. The solution required a floating type design for the pipes and included one river crossing requiring fluming and over pumping. The storage and pump tank required breaking out large volumes of limestone rock in a flooded area with proximity to the local river. The Cleantech Civils team mitigated and managed all environmental risks.
Our team’s expertise guaranteed the successful delivery of this project. We managed our works in a busy site location – with simultaneous construction being at the nearby Killala Business Park. The project was successfully delivered on time, within the budget, and with a strong focus on collaboration with the ESB.